Workshop with existing waterfront
Buroh Jurong Pioneer Tuas, Boon Lay / Jurong / Tuas
S$ 120,000 /mo
Negotiable60,000
sqft
Ready to move in Factory / Workshop (B2)

Photos

Map View
About this property
Waterfront repair workshop
A shipyard workshop
High ceiling
Direct access
Waterfront available to be confirm
Easy loading
Long trailer and lorry
High electricity up to 3000 amp
Rare to have
Viewing available
Call 9***** now
random keywords: Boilermaking Metal Fabrication Rigging Welding Pipefitting Ship Repair Scaffolding Machining Millwrighting Electrical Fitting Structural Fitting Crane Operations Blasting Painting NDT Testing Quality Control Valve Maintenance Fitting Turning Hydraulics Maintenance Pneumatics Repair Sheet Metal Fabrication Offshore Fabrication Heavy Haulage Industrial Rigging HVAC Fitting Insulation Fitting Marine Engineering Diesel Mechanics Pump Repair Alignment Services Galvanizing Heat Treatment Powder Coating Cladding Inspection Services Precision Machining Subsea Assembly Foundry Work Steel Erection Benoi Gul Tuas Waterfront Joo Koon Shipping Steel Sector Crescent Sector Loop Avenue Way Lane Link Road Terrace Place Quay Basin Drive View Boulevard Highway Depot Street Rise Loop Close Terminal Dock Jetty Extension Walk Gateway Park Ring Circuit Walkway Pass Crossing Plaza oil and gas yacht
High ceiling
Direct access
Waterfront available to be confirm
Easy loading
Long trailer and lorry
High electricity up to 3000 amp
Rare to have
Viewing available
Call 9***** now
random keywords: Boilermaking Metal Fabrication Rigging Welding Pipefitting Ship Repair Scaffolding Machining Millwrighting Electrical Fitting Structural Fitting Crane Operations Blasting Painting NDT Testing Quality Control Valve Maintenance Fitting Turning Hydraulics Maintenance Pneumatics Repair Sheet Metal Fabrication Offshore Fabrication Heavy Haulage Industrial Rigging HVAC Fitting Insulation Fitting Marine Engineering Diesel Mechanics Pump Repair Alignment Services Galvanizing Heat Treatment Powder Coating Cladding Inspection Services Precision Machining Subsea Assembly Foundry Work Steel Erection Benoi Gul Tuas Waterfront Joo Koon Shipping Steel Sector Crescent Sector Loop Avenue Way Lane Link Road Terrace Place Quay Basin Drive View Boulevard Highway Depot Street Rise Loop Close Terminal Dock Jetty Extension Walk Gateway Park Ring Circuit Walkway Pass Crossing Plaza oil and gas yacht
Amenities
Car parking outside
Security guard
Common facilities
24 hours security
Recommendations
FAQs
There are 0 bedroom(s) with 0 bathroom(s) in this unit.
The rent of this unit at Workshop with existing waterfront is about S$ 120,000 /mo.
The current rental PSF at Workshop with existing waterfront is about S$ 2.00 psf.
Workshop with existing waterfront is located at Buroh Jurong Pioneer Tuas, Boon Lay / Jurong / Tuas Boon Lay / Jurong / Tuas West (D22-24).
Floor size of this unit at Workshop with existing waterfront is 60,000 sqft.
Noticed anything off?Let us know if something's not right. We're continuously working to improve your experience.















